Click Here to Install Silverlight*
United StatesChange|All Microsoft Sites
Microsoft
Download Center 
Search Advanced Search

Microsoft® Team Foundation Server® 2010 and Microsoft Project Server® 2010 Integration CTP Hyper-V Virtual Machine

Brief Description
This virtual machine provides a community technical preview (CTP) of the integration of Team Foundation Sever 2010 with Project Server 2010. Included with this download are four walkthroughs that demonstrate using enterprise project plans in Project Server associated with team projects in Team Foundation Server.

On This Page

Quick Details
Version:July 2010 CTP
Date Published:8/26/2010
Language:English
Download Size:248 KB - 12236.5 MB*
*Download size depends on selected download components.

Overview


Please click here for instructions on how to more quickly download all files in this release.

This image will expire Dec 30th, 2010. This VHD release is available in English only.

This community technical preview of Team Foundation Server 2010 and Project Server 2010 Integration allows teams to share data between the two servers. This virtual machine includes enterprise project plans in Project Server mapped to team projects in Team Foundation Server, along with sample data to highlight key integration scenarios. The walkthrough documents provide four scenarios that simulate the interactions between the project manager, working in Project Server, and the software development team, working in Team Foundation Server.

The value of Project Server and Team Foundation Server integration is to provide up-to-date project status and resource availability across agile and formal teams; help project managers track high-level requirements and allow the team lead to manage the details; and permit project managers to live in Project Server and manage projects across the enterprise while development team leads live in Team Foundation Server and manage their software development project. With this tool, the Project Management Office (PMO) is able to plan, collaborate and track real-time progress made by formal or agile teams.

This virtual machine is running Windows Server 2008 Enterprise Edition R2. It contains a full installation of Visual Studio Team Foundation Server 2010, Visual Studio 2010 Ultimate, Project Server 2010, with Office 2010 and all necessary prerequisites. All Windows Updates as of April 16, 2010 have been applied.

This virtual machine does not have anti-virus software installed. It should not be connected to any network until it has anti-virus software installed.

 Top of page

System Requirements

  • Supported Operating Systems: Hyper-V Server 2008; Windows Server 2008; Windows Server 2008 R2

• Windows Server 2008 SP2 64-bit or Windows Server 2008 R2 with the Hyper-V role enabled

• Processor: Intel VT capable or AMD-V capable with 2 cores

• Disk Space: At least 50 GB of free disk space

• RAM: 8.0 GB of available physical RAM*
* The amount of physical RAM depends on what applications are running on the Hyper-V host machine. You can use the Task Manager to identify how much physical RAM is available on your machine.

 Top of page

Instructions


Download all of the files on this page. Instructions for using a download manager to more easily download all parts of this download in batch can be found here. We highly recommend following these instructions since it can save time starting your downloads, and helps to ensure that each part downloads completely.

Once all the files have been downloaded, run the self-extracting EXE to extract the virtual machine and its supporting files. The PowerPoint walkthrough instructions are available both on the desktop of each user below in the CTP and from this download page.



Log In Instructions for Walkthroughs



1 - Real-time project status for the PMO, user = linaa

2 - Agile teams are no longer black holes, user = jeffh

3 - Set the dial on your project plan details, user = karif

4 - Resource visibility for the PMO, user = markoz

Note: Passwords for all users is pass@word1 including Administrator. The domain is CONTOSO.

Setting up Hyper-V:

Download Virtual Machine Setup Guide.docx for detailed instructions on how to import this virtual machine.

When you start the VM, you will be asked to restart Windows. After the restart, wait 10 minutes to allow all the services to start.

We want your feedback!

http://social.msdn.microsoft.com/Forums/en-US/tfsprojectsrvint

We will be using the Team Foundation Server and Project Server Integration forum to capture your feedback and answer questions about the new Microsoft Team Foundation Server 2010 and Microsoft Project Server 2010 Integration CTP VHD Image.

Evaluation Period:

The Virtual Machines contained in this package are 180 day evaluations. Additionally they will require activation, or re-arming, after a 10 day period after which they will shut down after 2 hours of continuous operation. To "re-arm" the Virtual Machines use the shortcut provided under Start > All Programs > re-arm > Re-arm Windows (restart required). This will reset the grace period for 10 days. This can be done twice. In order to activate Windows you must add a second network card to each VM in Hyper-V and connect it to the Internet. Once connected you can activate Windows within the Virtual Machine and the VM will run for 180 days.

Due to the activation and expiration models in Windows Server 2008 and R2, it’s highly recommended that you do one of the following: Retain a copy of the unaltered VM or, Create and retain a snapshot from before first run of the VMs.

 Top of page

Files in This Download

The links in this section correspond to separate files available in this download. Download the files most appropriate for you.
File Name:File Size

1-Walkthrough-Real-time project status for the PMO.pptx

3.4 MB

2-Walkthrough-Agile teams are no longer black holes.pptx

1.9 MB

3-Walkthrough-Set the dial on your project plan details.pptx

2.1 MB

4-Walkthough-Resource visibility for the PMO.pptx

3.6 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0001.exe

10.3 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0002.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0003.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0004.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0005.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0006.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0007.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0008.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0009.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0010.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0011.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0012.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0013.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0014.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0015.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0016.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0017.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0018.rar

700.0 MB

package\en_tfs2010_projectserver2010_connector_ctp_hyperv_vm.part0019.rar

312.3 MB

Project Server-Team Foundation Server Community Technology Preview.pptx

2.6 MB

Virtual Machine Setup Guide.docx

248 KB

 Top of page

What Others Are Downloading

 Top of page


© 2010 Microsoft Corporation. All rights reserved. Contact Us |Terms of Use |Trademarks |Privacy Statement