Servers

    Microsoft® Forefront Identity Manager (FIM) Capacity Planning Guide

    Language:
    English
    This document describes items to consider when planning the capacity of your FIM 2010 installation.
    • Version:

      1

      File Name:

      FIM_Capacity_Planning.doc

      Date Published:

      8/16/2010

      File Size:

      768 KB

        This document discusses hardware, software, topologies, and general specifications that will help you ensure your FIM installation performs as planned.
    • Supported Operating System

      Windows Server 2008

        Word Viewer or Microsoft Office Word.
      • Download the document and review the information.
      • There are a number of variables that can affect the overall capacity and performance of your FIM 2010 deployment. The ways in which you physically deploy the FIM components (topology), as well as the hardware on which those components run, are important factors in determining the performance and capacity that you can expect from your FIM deployment. The number and complexity of the FIM policy configuration objects may be less obvious, but they are still significant factors to consider when planning for capacity. Finally, the expected scale of the deployment, as well as the load that is expected to be placed on it, are typically more obvious factors that affect performance and capacity

    Popular downloads

    Loading your results, please wait...

    Free PC updates

    • Security patches
    • Software updates
    • Service packs
    • Hardware drivers

    Microsoft suggests

    Download a free trial of Windows Server 2012 R2.
    Windows Server 2012 R2 free trial
    Experience the new and enhanced capabilities.
    Free trial