This newsletter contains archived content. No warranty is made as to technical accuracy of content or currency of URLs.
Prepare for success with a detailed and solid understanding of the IT infrastructure. With the new
Microsoft Assessment and Planning Tool, you have the ability to conduct network-wide assessment and determine your migration readiness to products like Windows Server 2008, Windows Server Virtualization, Microsoft Application Virtualization, Terminal Services, System Center Virtual Machine Manager, Windows Vista, and 2007 Microsoft Office. Download the new Microsoft Assessment and Planning Beta tool today!
The Windows Logo Kit (WLK) team is asking for your participation in the
annual WLK/DTM survey. We incorporated the feedback collected in this survey last January throughout 2007 to improve the WLK. Please help us ensure we make the right investments in 2008 by taking a few moments to
complete this quick survey.
Please Note: Access to this survey requires enrollment in the
WDK/WLK/WDF beta program. Once enrollment is completed, sign in to Microsoft Connect to access the survey.
In the 2007 survey you identified these items for us as top priorities:
1. Improved DTM stability and reliability.
2. One-click failure diagnosis.
3. Improved DTM test quality.
4. User interface designed for logo testing.
As a direct result of your feedback we delivered the following during 2007:
1. Enhanced setup experience with more robust setup engine.
2. Stability improvements in Studio and Client.
3. Enhancements to prevent missing jobs and jobs hanging in the scheduler.
4. Improved storage stress tests with more descriptive debugging/diagnostic output.
5. New log upload mechanism to guarantee log uploads.
6. Significantly improved engineering processes to ensure higher quality kits and better communication from the WLK team to the industry in the future.
7. Hundreds of bug fixes to address stability and reliability issues and improve test quality.
Also, in 2008 we will be releasing the first preview versions of the new logo-centric user interface which will include features for enhanced failure diagnosis.
Time is running out to sign up for the next LogoFest event being held in Munich-Unterhaching, Germany, February 26-28, 2008 at the Holiday Inn. This event is for licensed hardware partners who have signed the Logo License Agreement (LLA) 10.0 or 10.1 with Microsoft and want to earn the Windows Vista Logo by using the WLK 1.1. Additionally, participants will receive the latest logo information and learn how to earn the Windows Server 2008 Logo.
Event information:Dates: February 26 - 28, 2008
Participants are welcome to arrive February 25 for system setup beginning at 1 PM
Location:Holiday Inn Munich-Unterhaching
Inselkammerstrasse 7 - 9
D-82008 Unterhaching
Germany
http://www.holiday-inn-muenchen.deSubmit a registration request today!