Add a Microsoft Certification Booster Pack. Increase your odds with exam retake and practice test options.

Exam
MB6-884

Windows

  • Published:
    January 24, 2012
  • Languages:
    English
  • Audiences:
    Information workers
  • Technology:
    Microsoft Dynamics AX 2012
  • Credit toward certification:
    MCTS

Microsoft Dynamics AX 2012 Lean Manufacturing

* Secondary and higher education students may be eligible for special academic pricing (not available in India or China). See Exam policies and FAQ for details. Pricing does not reflect any promotional offers or reduced pricing for Microsoft Imagine Academy program members, Microsoft Certified Trainers, and Microsoft Partner Network program members. Pricing is subject to change without notice. Pricing does not include applicable taxes. Please confirm exact pricing with the exam provider before registering to take an exam.

Skills measured

This exam measures your ability to accomplish the technical tasks listed below. The percentages indicate the relative weight of each major topic area on the exam. The higher the percentage, the more questions you are likely to see on that content area on the exam. View video tutorials about the variety of question types on Microsoft exams.

Please note that the questions may test on, but will not be limited to, the topics described in the bulleted text.

Do you have feedback about the relevance of the skills measured on this exam? Please send Microsoft your comments. All feedback will be reviewed and incorporated as appropriate while still maintaining the validity and reliability of the certification process. Note that Microsoft will not respond directly to your feedback. We appreciate your input in ensuring the quality of the Microsoft Certification program.

If you have concerns about specific questions on this exam, please submit an exam challenge.

If you have other questions or feedback about Microsoft Certification exams or about the certification program, registration, or promotions, please contact your Regional Service Center.

Understand lean manufacturing concepts (17%)
  • Define and describe the core concepts of lean manufacturing
    • Five lean principles, lean enterprise, cell and line design, lean terminology, supported lean principles in Microsoft Dynamics AX 2012
  • Explain value stream theory
    • Operations support, value stream setup
  • Explain production flows
    • Value stream and production flows, production flow function, continuous improvement, semi-finished products (non-bill of materials [BOM] levels), products and materials in work in process (WIP)
  • Define and describe Kanbans
    • Kanban types, Kanban replenishment strategies, fixed-quantity Kanbans, scheduled Kanbans, event Kanbans, diagram Kanban type/replenishment strategy, Kanban boards, simple production flow, high-level production flow, setup, and interconnectivity

Preparation resources

Understand production flows (16%)
  • Explain production flow versions
    • Production flow functions, creating and activating a production flow version
  • Calculate takt time and cycle time
    • Fields and definitions, production flow version details
  • Set up production flow activities
    • Single process activity production flow, creating a process activity, validating and activating the production flow version
  • Create production flows
    • Create a single transfer activity production flow, create a two-activity production flow, create process and transfer activities
  • Explain inventory integration
    • Sites, warehouses, and locations; production flow activities, inventory, and storage concepts; update on hand; tracking and tracing; Warehouse Management System (WMS) integration; BOM settings and picking; picking activities
  • Explain semi-finished product concepts
    • Semi-finished activities, settings, and options; multi-process activity Kanbans; Kanbans that supply semi-finished product; WIP; products supplied by production flow activity stay in WIP; material directly transferred to WIP with transfer activity; products transferred out of production; Kanban supermarkets; variable consumption

Preparation resources

Use and manage Kanbans (15%)
  • Define and describe Kanban concepts
    • Manufacturing Kanban, withdrawal Kanban, Kanban replenishment strategies, subcontracting activities and manufacturing Kanbans, fixed-quantity Kanban subcontracts, alternative production flow subcontracts, manual printing of Kanban cards, automatic printing of Kanban cards and pick lists
  • Plan Kanban jobs
    • Planning a process Kanban job, work cell capacity, Kanban job status for process jobs, automatic planning of Kanbans, planning period fence, capacity shortage reaction, loading Kanban jobs on the Kanban schedule, lean schedule groups, Kanban schedule board, changing Kanban job statuses
  • Process Kanban jobs
    • Kanban Board for Process Jobs form—Pick functions, Manufacture functions, View functions, Job Details fields; prepare Kanban; start Kanban; complete Kanban; Kanban Board for Transfer Jobs form buttons; processing a transfer job
  • Set up and configure Kanban quantity calculation policies
    • Kanban Quantity Calculation Policies form; creating quantity calculations to generate and update Kanban rules; Kanban quantity simple formula; Kanban quantity, including safety factor and safety stock; associating Kanban policy to Kanban rule

Preparation resources

Using event Kanbans (13%)
  • Set up rules for event Kanbans
    • Kanban Rules form; Kanban Rules—Details fields, Quantities fields, Kanban and Cards fields, Events fields, Production Flow fields
  • Set up sales line events
    • Pegging tree
  • Set up and process Capable to Promise (CTP)
    • Delivery date control CTP, batch calculation using CTP
  • Set up Kanban line events
    • Manual creation of event Kanbans, batch processing of event Kanbans, Kanban line events, sales line events, BOM line events, stock replenishment events, item coverage settings

Preparation resources

Understand scheduled Kanbans (13%)
  • Describe processes associated with the planned order type Kanban
    • Default order type, planned order rules
  • Describe how to use the supply schedule
    • Navigation to supply schedule, supply schedule display, processing with the supply schedule
  • Set up rules for scheduled Kanbans
    • Kanban Rules form; Kanban rules—Details fields, Quantities fields, Kanban and Cards fields, production flow fields, Kanbans fields; product family and item allocation keys; inventory considerations for scheduled Kanbans
  • Plan scheduled Kanbans
    • Scheduled Kanban planned order quantities, scheduled Kanbans and action messages, material requirements planning (MRP) considerations

Preparation resources

Define and set up activity-based subcontracting (12%)
  • Subcontract vendor payments
    • Purchase agreements, purchase agreement header, Purchase Agreement Lines fields
  • Set up production flow with subcontracting activities
    • Subcontracting service, subcontracting service terms, assigning multiple service terms, transfer activities as subcontracting activities, create purchase documents for Subcontracting form
  • Perform cost accounting of subcontracted services
    • Direct outsourcing cost group type, cost calculation, subcontracting cost flow

Preparation resources

Describe production flow costing (14%)
  • Explain standard cost requirements
    • Exception for transfer jobs, standard cost inventory model, standard cost for materials, standard cost for finished products, standard cost for subcontracted services, applied conversion on lean manufacturing
  • Describe how to use components for lean manufacturing
    • Costing setup for lean manufacturing, application of costs and variances, indirect manufacturing costs, production group, inventory posting profile, calculation of standard cost, calculation based on the production flow, default production flow, calculation based on the route, choosing the calculation method, flattening of BOM during cost calculation for lean items
  • Explain backflush costing concepts
    • Periodic backflush costing, end of period—backflush costing, calculation of the production flow's net realized usage over a period, clearing production flow's work in progress for the period, calculation for unused quantities, financial update for completed quantities, financial update for consumed products, products and materials in work in progress, clearing WIP for conversion costs—direct manufacturing, clearing WIP for conversion costs—indirect manufacturing, reinstating indirect cost for unused material quantities, calculation of production variances to standard cost, standard cost revaluations
  • Report production flow activities
    • Typical production flow transactions; variations when reporting production flow activities; ledger transactions for withdrawal type activities; inventory-controlled transfers within a single entity; inventory-controlled transfers across entities; non–inventory-controlled transfers from inventory to a production flow; Kanban scan empty transactions for location type Kanban supermarket; production completion transactions; Kanban job picking activity; production flow standard cost transactions; production flow WIP value; viewing the WIP balance of a production flow; subcontracting costing; viewing subcontracted activity costing; references

Preparation resources

Preparation options

Instructor-led training
Find a Microsoft Learning Partner near you
From the community

Follow @MSLearning

See more posts on the Microsoft Dynamics Community blog

Who should take this exam?

This exam is designed for partners, consultants, pre-sales consultants, and professionals who plan to use lean manufacturing functions in Microsoft Dynamics AX 2012. Candidates should have a general working knowledge of Microsoft Dynamics AX 2012, including production and trade and logistics concepts, along with a moderate understanding of basic lean manufacturing concepts and production processes.

More information about exams

Preparing for an exam

We recommend that you review this exam preparation guide in its entirety and familiarize yourself with the resources on this website before you schedule your exam. See the Microsoft Certification exam overview for information about registration, videos of typical exam question formats, and other preparation resources. For information on exam policies and scoring, see the Microsoft Certification exam policies and FAQs.

Note

This preparation guide is subject to change at any time without prior notice and at the sole discretion of Microsoft. Microsoft exams might include adaptive testing technology and simulation items. Microsoft does not identify the format in which exams are presented. Please use this preparation guide to prepare for the exam, regardless of its format. To help you prepare for this exam, Microsoft recommends that you have hands-on experience with the product and that you use the specified training resources. These training resources do not necessarily cover all of the topics listed in the "Skills measured" section.