The visual collaboration canvas in Microsoft 365 for flexible work and learning.
SWOT analysis board displayed during a virtual marketing sync meeting.
Overview

Share ideas seamlessly

  • Kick-start and accelerate your ideation process—visualizing, categorizing, and summarizing your thoughts.
  • Run more effective meetings, visualize ideas, and work creatively with your team.
  • Choose from more than 60 free templates to help you get started faster, generate flow, and design structure for your innovative ideas.
    Team on video call reviewing whiteboard templates for collaboration.
  • Stay in the flow with Loop components in Whiteboard that sync across chats, meetings, emails, and documents.
  • Get more engagement and maximize learning outcomes with students.
What’s new

Visualize your ideas in a collaborative, inclusive way

Facilitate your next Teams meeting using simple, yet powerful visual tools, such as customizable templates, inking, and sticky notes.

Download the Whiteboard app

Get the app for Windows

 Get the app for iOS

Get the app for Android

A person with curly hair smiles while holding an open laptop outdoors near a building.
Pricing

Get started with Microsoft 365

Enjoy online security, innovative apps, and cloud storage across your devices and on the web with Microsoft 365.
FAQ

Frequently asked questions

  • A digital whiteboard is an app that functions like a traditional whiteboard but is hosted virtually. Digital whiteboards can work seamlessly with other video conferencing and screen-sharing platforms to make collaboration possible, even when everyone isn’t physically in the same room. A digital whiteboard offers multiple colors, shapes, and templates to choose from and can be saved as a shareable file for easy access in the future.
  • A digital whiteboard can enhance a virtual or in-person meeting by making collaboration easier. A whiteboard can help people visualize a process and improve collaboration by allowing participants to easily add ideas with sticky notes or colored markers.
  • A whiteboard can help increase productivity by allowing people to easily draw processes using different shapes and colors. A digital whiteboard further enhances productivity by making it easy to copy or remove parts of the whiteboard and save the file for future use.
  • Drawing on a whiteboard is easy. Many digital whiteboards allow you to type text and select various shapes to further simplify your experience.

    If you’re a skilled writer or artist, you can choose your pen colors and thickness and draw freehand using a mouse, trackpad, or touchscreen. Using a touchscreen is the best way to simulate writing on a physical whiteboard.
  • Yes, digital whiteboards are great for playing games in the classroom, at a work activity, or with your family and friends. Digital whiteboards make it easy to share your screen and play interactive games with others.
  • Whiteboard is enabled by default for most Microsoft 365 tenants. Check this and other settings and enable Whiteboard in the admin center. Learn more.
  • Whiteboard content is stored in OneDrive for Business and Azure. OneDrive for Business is the default storage for all new whiteboards. Whiteboards that were originally created in Azure and whiteboards that were initiated on a Surface Hub or a Microsoft Teams Rooms device are stored in Azure. Learn more about where your Whiteboard customer data is stored.
  • Whiteboard has always been free for students and education professionals as a part of the Microsoft 365 A1 offer. It’s enabled by default for Microsoft 365 tenants. Check this and other settings and enable Whiteboard in your admin center. Learn more.
  • Yes, you can add sticky notes and text in Teams or the Whiteboard app on Windows 11, iOS, and Surface Hub.
  • Use Whiteboard to collaborate with your team or classroom to accomplish many activities, such as:
    • Holding workshops
    • Running effective meetings 
    • Brainstorming 
    • Team sprint planning 
    • Project planning 
    • Problem solving 
    • Managing incidents
    With the Whiteboard app on Windows 11 or iOS, it’s easy to get started right away using templates. Open an existing board or create a new one, tap the + button on the toolbar, and select Templates.
  • Whiteboard is automatically enabled for applicable Microsoft 365 tenants, including in Teams. Make your meetings more collaborative by sharing a whiteboard with all participants. That same whiteboard is simultaneously available in the Whiteboard app on Windows 11, iOS, Surface Hub, and the web. To prepare ahead of time:
    • Right-click on the meeting invite in your Teams calendar and select Chat with participants. Go to the Whiteboard tab at the top of the meeting chat to add content and get the board ready.
    • After joining a Teams meeting, select the Share icon in the share tray of that meeting.
    • In the Whiteboard section, select Microsoft Whiteboard.
     Access the same whiteboard after the meeting and continue working on it from the Whiteboard tab in the meeting chat or in the Whiteboard app. Learn more about using Whiteboard in Teams.
  • Yes, Whiteboard was designed for remote and in-classroom learning. In the classroom, students leave the class with a digital version of the whiteboard, so they can focus on listening and learning instead of copying content from the whiteboard during class.

    Teachers can run more interactive lessons using a shared whiteboard where students can add their content or react to content added by others. Whiteboard is a great tool for working on group projects, keeping all project members engaged, and giving teachers an opportunity to watch and provide feedback.
  • Read-only mode for Whiteboard in a Teams meeting allows the meeting organizer to choose how they want participants to interact with the board. When a presenter chooses read-only mode, all other meeting participants on the whiteboard will have a view-only experience. At any time during the meeting, the organizer can allow collaboration from others from the Settings menu. For enterprise customers, whiteboards default to collaboration mode. For education customers, teachers can choose read-only or collaboration mode before creating each whiteboard.
  • Whiteboard allows you to export your board to your OneNote class notebooks with the Send to OneNote option in the settings menu.
Close-up of a shiny, abstract sculpture with smooth, rounded, and translucent forms in pastel colors.
Two people are sitting indoors, looking at a tablet. One person is holding and the other is pointing at it.
Next steps

Get started with Microsoft 365

Improve productivity at home or in your business with Microsoft 365.
A digital interface with blurred photos, colorful tabs, and an input box displaying "Ask me anything.
Microsoft Copilot

Check out Microsoft 365 Copilot

Get more done faster with an AI assistant in your Microsoft 365 apps, documents, and meetings.
A person in a green sweater smiles while using a laptop at a table in a bright room with large windows.
Free Trial

Try Microsoft 365 for home

Enjoy the apps, security, and storage you need to accomplish your goals—now free for one month.*
Two people walking in a hallway, having a conversation. One is holding a tablet. There's a large plant nearby.
Free Trial

Try Microsoft 365 for business

Create, connect, and collaborate on web, desktop, and mobile apps to keep your business growing—try Microsoft 365 Business Standard for free for one month.*
  1. [*]
    After your one-month free trial ends, your subscription will automatically convert to a 12-month paid subscription, and you’ll be charged the applicable subscription fee. Cancel anytime during your free trial to stop future charges. A credit card is required to sign up. Learn more.

Follow Microsoft 365

English (United States) Consumer Health Privacy Sitemap Contact Microsoft Privacy Manage cookies Terms of use Trademarks Safety & eco Recycling About our ads